日韩一二三区-国产丝袜在线-久久少妇-激情小说五月天-国产精品卡一卡二-高清免费av-国产成人av网站-国产精品99久久久久久久久久久久-天堂网亚洲-日韩日b-在线免费观看亚洲-99热香蕉-明星毛片-一区二区三区啪啪啪-亚洲 高清 成人 动漫-亚洲91久久-一级特黄欧美-国产 日韩 欧美 精品-成人性生交7777-亚洲一区二区视频在线播放-亚洲精品在线播放视频-亚洲精品乱码久久久久久9色-哪里可以看免费毛片-国产在线精品福利-www.射.com

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

No.07 SD20 Rotary Drill construct in XiLong Jobsite

2009-07-07

Recently, in XiLong hydro junction jobsite, <?xml:namespace prefix = st1 ns = "urn:schemas-microsoft-com:office:smarttags" />Hubei province, one unit SD20 which had worked for 6000 hours has set the new record in foundation piles.

<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" />

?

XiLong hydro junction started in Feb, 2009 is the major national project, which is located in HuBei province. One of important projects is to establish a bridge on old riverbed. It is difficult with high pile requirements. The pile should be 1.5m Dia and 55m Dep. The situation of the old riverbed is complicated, and alternative allocated with clay, fine sand, and locked clay from 0-30m, below 30m, there is big and hard cobble layer.


When SD20 applied to the project, it finish a 55m depth and 1.5 dia pile with 8 hours, high efficiency and precision is praised by the projects owner. This SD20 had worked more than 6000 hours since may, 2006. The excellent performance has greatly proved the quality of our machines.

Now, this project is under way, SD20 and SG40A, SG40E worked there day and night to contribute to the national infrastructure projects.